Aluminium Extrusion Manufacturer Malaysia | Superb Aluminium

FAQ

Question

Die Shop / Drawing

Die mould is outsourced to a foreign investment company.

  1. Upon receipt of die, die testing is done.
  2. Extrude sample -> check dimensions and customer’s specifications/requirements
  3. Submit sample together with approval sheet to customer for approval
  4. Production run after customer’s approval.

Hotwork Steel – H13

2 to 3 working days.

  1. Drawing to be signed off as confirmation
  2. Payment of die fabrication
  3. For 5” & 7” die – 2 to 3 working weeks.
  4. For 10” die – 4 to 5 working weeks

1 working week upon receipt of die.

Hollow profile: 250mm x 120mm
Solid profile: 300mm x 100mm

appendix A die classification

Extrusion

We have 5 press lines:

  1. 5” Press machine (3)
  2. 7” Press machine (1)
  3. 10” Press machine (1)

7.5 metres length

Commonly available: AA6063, AA6061, AA1070
Special alloy: AA6463, AA6082, AA6005, AA6101

Temper60636061
T1 / T4< 4
T525 – 8
T5>/=10
T6>/=12>/=14
  1. 5” die – 300kgs
  2. 7” die – 500kgs
  3. 10” die – 1,000kgs

Please refer here.

  1. Mill finish – 2 working weeks
  2. Powder coating – Mill finish (+ availability of powder) + 1 working week
  3. Anodised finish – Mill finish + 2 working weeks
  4. Packing and loading for shipment – 1 week

Actual lead time may vary depending on the order volume, powder coating and/or anodising specifications and availability of powder.

Powder Coating

We have two (2) powder coating lines.

60 – 80 microns

Impact test, bending test and cross cut test.

We work within the below guidelines:

  1. AAMA 2603 – 10 years warranty
  2. AAMA 2604 – 20 to 25 years warranty
  3. AAMA 2605 – 30 years warranty

We can colour match based on your colour swatch or colour spec (RGB, RAL, Pantone)

  1. Lead-time for colour matching – 1 working week
  2. Lead-time for powder – 2 working weeks
  1. Maximum profile width up to 0.35 metres
  2. Maximum profile height up to 1.2 metres
  3. Maximum length up to 7 metres
 
  1. Mill finish – 2 working weeks
  2. Powder coating – Mill finish (+ availability of powder) + 1 working week
  3. Packing and loading for shipment – 1 week
  4. Actual lead time may vary depending on the order volume, powder coating and/or anodising specifications and availability of powder.
  1. Common solid colour – black or white or grey: no MOQ.
  2. Powder not stocked by Superb/supplier – MOQ 100 to 200kgs per colour / order. Lead time: 2 weeks.
  3. Imported powder – MOQ of 200kgs per colour order (that would be approx. for 10MT of material). Lead time: 4 weeks.

We are certified powder coating applicators for DGL (formerly known as Dulux), PPG, Interpon, Jotun, Axalta and Oxyplast.

Others

Refer to Project Gallery.

Australia, Singapore, U.S.A, Africa and China.

This service is available.  Please advise the brand, model of the thermal break required.

  1. We are a full-fledged provider, from extrusions to finishing as well as design and prototype development, machining services.
  2. Our products have received the Standard Compliance Declaration (Perakuan Pematuhan Standard or PPS) from CIDB to be used for construction projects.
  3. We are accredited to ISO 9001:2015
  4. Approved applicators of international powder coating brands.
  5. Enjoy preferred import duties on our products with Certificate of Origin for international deliveries.